New or bigger grid connection in Hungary: how long may it take and who do I complain to?
A new home, a heat pump, a charging point or solar panels can need a new or bigger connection. The grid operator does this work, and many countries set deadlines and rules on costs.
FFCheck One: every FFCheck Letter included, €4.99 a month
A formal letter for your problem whenever you need one: PDF and email text, with the final reminder and your next step. Cancel any time.
Facts from this page's own sources · a small team in Amsterdam · no ad networks · delete everything any time
📜 The rules in Hungary
Grid connection
After you apply for a new connection, the grid operator has 8 days to accept, refuse or ask for missing documents, then sends a detailed offer with costs (usually valid 30 days). Connection fees are set by MEKH decree; discounted or free connections exist under conditions.
- Electricity: the connection point is built within 15 days of the public network being available. Gas: the offer must give a capacity date no later than 60 days, not counting pipeline building and permits. (www-wb.mekh.hu)
- If the technical conditions are met, the operator carries out the technical handover within 8 days; the meter can be fitted once you have a grid-use and a supply contract. You pay for the meter box and the wiring on your side. (www-wb.mekh.hu)
- Complaints about technical and connection matters go to MEKH, after you have first tried to settle them with the operator. (mekh.hu)
🪜 Step by step
- Apply to the grid operatorApply to the grid operator for your address, not your supplier. Say what you want to connect and the capacity you need.
- Ask for a quote and a dateThe grid operator should tell you the cost and when the work will be done. See the rules for Hungary below.
- Keep track of deadlinesWrite down the dates. If a deadline is missed, ask why in writing.
- Complain if it goes wrongComplain to the grid operator first, then to the body named below.
📇 Who to contact
❓ Questions
Who pays for the connection?
Usually the customer pays a connection charge set by the grid operator or the regulator.
Why does my grid operator refuse or delay?
Sometimes the local grid is full. Ask for the reason and the expected date in writing.
Do I need a new connection for solar panels?
Often not for small systems, but you usually have to register them with the grid operator.
📎 Sources
- www-wb.mekh.hu →
- mekh.hu › hova fordulhatok lakossagi felhasznalok tarsashazak →
- eon.hu › pestmegyeihalozat →
- mvmemaszhalozat.hu →
- mvmhalozat.hu →
- eon.hu →
- mekh.hu →
- bekeltetes.hu →
🧭 Is this still correct?
We check this information carefully, but phone numbers, websites and rules change — and sometimes we get something wrong. Spotted a mistake or a change? Let us know below.
This form only corrects this page. It does not go to the police or any authority, and nobody will act on what you write. To report something, use the contacts on this page. In an emergency, call the emergency number. Do not write names, number plates or other people's details here.
⚠️ Readers report that something here may have changed — we are checking it.
✅ Thank you — this keeps the page up to date for everyone.