Electricity & gas
ES
Electricity & gas · Spain
Checked 2026-09-27

☀️ Solar panels in Spain: what do I get for the power I feed in?

The short answer

If you produce more than you use, the surplus goes into the grid. How you are paid for it depends on the national scheme.

FFCheck

FFCheck One: every FFCheck Letter included, €4.99 a month

A formal letter for your problem whenever you need one: PDF and email text, with the final reminder and your next step. Cancel any time.

See the options
Your options

Facts from this page's own sources · a small team in Amsterdam · no ad networks · delete everything any time

📜 The rules in Spain

Solar panels

Owners of renewable systems up to 100 kW can have surplus power offset on their monthly electricity bill (simplified compensation). Alternatively, surplus can be sold, but not both at the same time.

Autoconsumo con compensación simplificada de excedentes
Official source: miteco.gob.es · Checked 2026-09-27

🪜 Step by step

  1. Register your installationGrid operators require new installations to be registered before or right after connection.
  2. Know your schemeSee below how feed-in is paid in Spain.
  3. Compare offersSome suppliers pay more for surplus power than others. Check the conditions.
  4. Use more of your own powerRunning appliances while the sun shines is usually worth more than selling the surplus.

📇 Who to contact

e-distribución (Endesa) — 24 provincias de 8 comunidades autónomas y Ceuta (mira en tu factura cuál es tu distribuidora)Runs the local grid, meters and connectionsPower cut, meter problem, new connection📞 900 878 212🔗 www.edistribucion.com/es/averias.html
Viesgo DistribuciónRuns the local grid, meters and connectionsPower cut, meter problem, new connection📞 900 101 051🔗 www.viesgodistribucion.com/contactanos
E-REDESRuns the local grid, meters and connectionsPower cut, meter problem, new connection📞 900 907 001🔗 www.eredesdistribucion.es/contactanos
CNMC - Comisión Nacional de los Mercados y la CompetenciaSupervises energy companies and explains your rightsFor information, and to report a company that breaks the rules📞 +34 91 432 96 00🔗 www.cnmc.es

❓ Questions

Do I need permission?

Small installations usually only need to be registered. Check with the grid operator.

Can the scheme change?

Yes, feed-in rules change regularly. The date we checked is on this page.

Do I pay tax on it?

That depends on the country and the amounts. Check with the tax office.

📎 Sources

Checked: 2026-09-27

🧭 Is this still correct?

We check this information carefully, but phone numbers, websites and rules change — and sometimes we get something wrong. Spotted a mistake or a change? Let us know below.

This form only corrects this page. It does not go to the police or any authority, and nobody will act on what you write. To report something, use the contacts on this page. In an emergency, call the emergency number. Do not write names, number plates or other people's details here.

🔗 Also useful

More help in Spain