The short answer

A smart meter sends readings automatically, so your bill is based on real use. Whether you can refuse one differs per country.

FFCheck

FFCheck One: every FFCheck Letter included, €4.99 a month

A formal letter for your problem whenever you need one: PDF and email text, with the final reminder and your next step. Cancel any time.

See the options
Your options

Facts from this page's own sources · a small team in Amsterdam · no ad networks · delete everything any time

📜 The rules in Slovakia

Smart meter

Distributors fit smart meters (IMS) in low-voltage homes that use at least 4 MWh a year, have a generation or storage unit over 0.8 kW, or have an EV charging point. Anyone else can ask their distributor for one; it must be installed within four months of the request. You cannot formally refuse: if you do not cooperate the installation is postponed, and once you allow it the meter is fitted within 90 days. A supplier with an ÚRSO-regulated contract must inform you of your right to a smart meter. If you are outside these groups and ask for one, you pay the installation at the price in your distributor's published operating rules; the distributor must publish those costs and the meter types on its website and tell you the functions and costs before installing. A planned meter exchange must be announced at least 15 days ahead. You can also have your meter tested: the distributor arranges it within 30 days of your written request and bears the cost if the meter was wrong, otherwise you pay.

Official source: static.slov-lex.sk · Checked 2026-09-27

🪜 Step by step

  1. Check the letterWho installs it, the grid operator or the supplier, and when?
  2. Know your rightsSee below what the rules in Slovakia are on the rollout and on refusing.
  3. Protect your dataAsk what data is collected and how often. You can usually see your own use online.
  4. Report problemsIf the meter seems wrong, ask the grid operator for a meter test.

📇 Who to contact

Západoslovenská distribučná — západné SlovenskoRuns the local grid, meters and connectionsPower cut, meter problem, new connection📞 0800 111 567🔗 www.zsdis.sk/Uvod/Nahlasenie-poruchy
Stredoslovenská distribučná — stredné SlovenskoRuns the local grid, meters and connectionsPower cut, meter problem, new connection📞 0800 159 000🔗 www.ssd.sk/domacnosti/ako-postupovat-ked-vam-nejde-elektrina?page_id=6968
Východoslovenská distribučná — východné SlovenskoRuns the local grid, meters and connectionsPower cut, meter problem, new connection📞 0800 123 332🔗 www.vsds.sk/edso/domov/spolocnost/kontakty/poruchova-linka
Úrad pre reguláciu sieťových odvetví (ÚRSO)Supervises energy companies and explains your rightsFor information, and to report a company that breaks the rules📞 +421 2 581 004 11🔗 www.urso.gov.sk
Spoločnosť ochrany spotrebiteľov (S.O.S.) PopradIndependent advice for consumersFor advice, template letters and a second opinion🔗 www.sospotrebitelov.sk

❓ Questions

Does a smart meter cost extra?

The costs are usually part of the network charges. Some countries charge people who refuse.

Is my data safe?

Meter data is protected by data-protection law, and you decide who else may see detailed data.

What if the readings look wrong?

Ask the grid operator to check the meter.

📎 Sources

Checked: 2026-09-27

🧭 Is this still correct?

We check this information carefully, but phone numbers, websites and rules change — and sometimes we get something wrong. Spotted a mistake or a change? Let us know below.

This form only corrects this page. It does not go to the police or any authority, and nobody will act on what you write. To report something, use the contacts on this page. In an emergency, call the emergency number. Do not write names, number plates or other people's details here.

🔗 Also useful

More help in Slovakia