☀️ Solar panels in Italy: what do I get for the power I feed in?

The short answer

If you produce more than you use, the surplus goes into the grid. How you are paid for it depends on the national scheme.

📜 The rules in Italy

Solar panels

Net metering (Scambio sul posto) is closed to new systems: only plants in operation by 29 May 2025 could apply, until 26 September 2025. New solar owners can sell exported power to GSE through Ritiro Dedicato.

Ritiro Dedicato (RID)
Official source: gse.it · Checked 2026-09-27

🪜 Step by step

  1. Register your installationGrid operators require new installations to be registered before or right after connection.
  2. Know your schemeSee below how feed-in is paid in Italy.
  3. Compare offersSome suppliers pay more for surplus power than others. Check the conditions.
  4. Use more of your own powerRunning appliances while the sun shines is usually worth more than selling the surplus.

📇 Who to contact

e-distribuzione — Most of Italy (check your bill for your distributor)Runs the local grid, meters and connectionsPower cut, meter problem, new connection📞 803.500🔗 www.e-distribuzione.it
ARERA - Autorità di Regolazione per Energia Reti e AmbienteSupervises energy companies and explains your rightsFor information, and to report a company that breaks the rules📞 800.166.654🔗 www.arera.it/consumatori

❓ Questions

Do I need permission?

Small installations usually only need to be registered. Check with the grid operator.

Can the scheme change?

Yes, feed-in rules change regularly. The date we checked is on this page.

Do I pay tax on it?

That depends on the country and the amounts. Check with the tax office.