New or bigger grid connection in Portugal: how long may it take and who do I complain to?
A new home, a heat pump, a charging point or solar panels can need a new or bigger connection. The grid operator does this work, and many countries set deadlines and rules on costs.
FFCheck One: every FFCheck Letter included, €4.99 a month
A formal letter for your problem whenever you need one: PDF and email text, with the final reminder and your next step. Cancel any time.
Facts from this page's own sources · a small team in Amsterdam · no ad networks · delete everything any time
📜 The rules in Portugal
Grid connection
For a new connection or more power, apply to the grid operator (E-REDES on the mainland), preferably in its Balcão Digital. It must send a quote within 15 working days; after you accept and pay, low-voltage work must be done within 30 working days (extendable to 45).
- If the grid operator misses these deadlines, it pays you 20 euros compensation (RQS art. 105), unless the case is especially complex and duly justified. (erse.pt)
- You have 30 working days to accept the quote and choose who builds the connection, or the request is cancelled. Network contribution charges are set by ERSE and depend on the requested power and voltage level. (e-redes.pt)
- For a gas connection with consumption up to 10,000 m3 a year, the gas distributor must send a quote within 30 working days and connect within 30 working days (extendable to 45). (erse.pt)
🪜 Step by step
- Apply to the grid operatorApply to the grid operator for your address, not your supplier. Say what you want to connect and the capacity you need.
- Ask for a quote and a dateThe grid operator should tell you the cost and when the work will be done. See the rules for Portugal below.
- Keep track of deadlinesWrite down the dates. If a deadline is missed, ask why in writing.
- Complain if it goes wrongComplain to the grid operator first, then to the body named below.
📇 Who to contact
❓ Questions
Who pays for the connection?
Usually the customer pays a connection charge set by the grid operator or the regulator.
Why does my grid operator refuse or delay?
Sometimes the local grid is full. Ask for the reason and the expected date in writing.
Do I need a new connection for solar panels?
Often not for small systems, but you usually have to register them with the grid operator.
📎 Sources
- erse.pt › erseforma ligações às redes (PDF) →
- e-redes.pt › connection electricity grid request →
- e-redes.pt →
- erse.pt › consumidores de energia →
- erse.pt › centros de arbitragem →
🧭 Is this still correct?
We check this information carefully, but phone numbers, websites and rules change — and sometimes we get something wrong. Spotted a mistake or a change? Let us know below.
This form only corrects this page. It does not go to the police or any authority, and nobody will act on what you write. To report something, use the contacts on this page. In an emergency, call the emergency number. Do not write names, number plates or other people's details here.
⚠️ Readers report that something here may have changed — we are checking it.
✅ Thank you — this keeps the page up to date for everyone.