Solar panels in Slovenia: what do I get for the power I feed in?
If you produce more than you use, the surplus goes into the grid. How you are paid for it depends on the national scheme.
📜 The rules in Slovenia
Solar panels
Annual net metering only continues for self-supply systems registered by 31 December 2023. Systems joining from 2024 are billed without netting: network charges apply to all power taken from the grid. Systems up to 50 kW can connect via a simplified procedure.
🪜 Step by step
- Register your installationGrid operators require new installations to be registered before or right after connection.
- Know your schemeSee below how feed-in is paid in Slovenia.
- Compare offersSome suppliers pay more for surplus power than others. Check the conditions.
- Use more of your own powerRunning appliances while the sun shines is usually worth more than selling the surplus.
📇 Who to contact
❓ Questions
Do I need permission?
Small installations usually only need to be registered. Check with the grid operator.
Can the scheme change?
Yes, feed-in rules change regularly. The date we checked is on this page.
Do I pay tax on it?
That depends on the country and the amounts. Check with the tax office.
📎 Sources
- energetika-portal.si →
- elektro-celje.si →
- elektro-gorenjska.si →
- elektro-ljubljana.si →
- elektro-maribor.si →
- elektro-primorska.si →
- agen-rs.si →
🧭 Is this still correct?
We check this information carefully, but phone numbers, websites and rules change — and sometimes we get something wrong. Spotted a mistake or a change? Let us know below.
⚠️ Readers report that something here may have changed — we are checking it.
✅ Thank you — this keeps the page up to date for everyone.