🔋 Can I install a charging point for my electric car at home in Denmark?

The short answer

A home charging point needs a safe installation and often a notification to the grid operator. Tenants and flat owners may need permission, and some countries give a right to install.

FFCheck

FFCheck One: every FFCheck Letter included, €4.99 a month

A formal letter for your problem whenever you need one: PDF and email text, with the final reminder and your next step. Cancel any time.

See the options
Your options

Facts from this page's own sources · a small team in Amsterdam · no ad networks · delete everything any time

📜 The rules in Denmark

Charging an electric car at home

Since 1 January 2026, tenants, flat owners and co-op members with their own parking space on the property have a right to install a charging point there. Give the landlord or association 3 months' notice; you pay the costs and must use an authorised electrician.

  • The landlord or association may ask for security for restoring the space and may refuse for architectural or technical reasons, older registered easements, listed buildings, or (for tenants) if there is already one charging point per ten parking spaces. (retsinformation.dk)
  • When you move out, you must restore the space unless you agree otherwise. (retsinformation.dk)
Official source: retsinformation.dk · Checked 2026-09-30

🪜 Step by step

  1. Check your connectionAsk an electrician whether your connection and meter can handle the charger.
  2. Ask permission where neededTenants ask the landlord and flat owners the owners' association. See below what the rules in Denmark say.
  3. Notify the grid operatorMany grid operators want to know about a charging point before or after it is installed. See the rules below.
  4. Use a qualified installerHave the charging point installed and tested by a qualified electrician.

📇 Who to contact

Cerius — Nordvest-, Midt- og Sydsjælland, Lolland-Falster og øerneRuns the local grid, meters and connectionsPower cut, meter problem, new connection📞 70 29 20 24🔗 cerius.dk/stroemafbrydelse
Vores ElnetRuns the local grid, meters and connectionsPower cut, meter problem, new connection📞 63 10 81 00🔗 voreselnet.dk/kontakt-os
Radius Elnet — Københavnsområdet, Nordsjælland og dele af MidtsjællandRuns the local grid, meters and connectionsPower cut, meter problem, new connection📞 70 20 48 00🔗 radiuselnet.dk/stroemafbrydelse
N1Runs the local grid, meters and connectionsPower cut, meter problem, new connection📞 70 23 00 43🔗 n1.dk/driftsstatus
ForsyningstilsynetSupervises energy companies and explains your rightsFor information, and to report a company that breaks the rules📞 4171 5400🔗 forsyningstilsynet.dk

❓ Questions

Can my landlord refuse?

That depends on the rules in Denmark. Where there is a right to install, a refusal usually needs a good reason.

Do I need a bigger connection?

Not always. The electrician and the grid operator can tell you.

Can I charge cheaper at night?

With a time-of-use or dynamic price, charging at off-peak hours can cost less. Ask your supplier.

📎 Sources

Checked: 2026-09-30

🧭 Is this still correct?

We check this information carefully, but phone numbers, websites and rules change — and sometimes we get something wrong. Spotted a mistake or a change? Let us know below.

This form only corrects this page. It does not go to the police or any authority, and nobody will act on what you write. To report something, use the contacts on this page. In an emergency, call the emergency number. Do not write names, number plates or other people's details here.