🔗 New or bigger grid connection in Denmark: how long may it take and who do I complain to?

The short answer

A new home, a heat pump, a charging point or solar panels can need a new or bigger connection. The grid operator does this work, and many countries set deadlines and rules on costs.

FFCheck

FFCheck One: every FFCheck Letter included, €4.99 a month

A formal letter for your problem whenever you need one: PDF and email text, with the final reminder and your next step. Cancel any time.

See the options
Your options

Facts from this page's own sources · a small team in Amsterdam · no ad networks · delete everything any time

📜 The rules in Denmark

Grid connection

For a new or bigger connection you pay a connection fee (tilslutningsbidrag) to the grid company before the work. The fee depends on the type of home and capacity and follows rules approved by Forsyningstilsynet. An authorised electrician must file the request.

  • Most grid companies use the industry's standard connection fees, which are filed with and approved by Forsyningstilsynet (the current standard was approved in 2021 and may be used until the end of 2027). For 2026, excluding VAT: 18,800 kr for a detached or holiday house (25 A), 15,040 kr for a terraced house (25 A), 10,270 kr for a standard flat (16 A). Each grid company files its own fee, so check yours. (elnet.dk)
Official source: radiuselnet.dk · Checked 2026-09-30

🪜 Step by step

  1. Apply to the grid operatorApply to the grid operator for your address, not your supplier. Say what you want to connect and the capacity you need.
  2. Ask for a quote and a dateThe grid operator should tell you the cost and when the work will be done. See the rules for Denmark below.
  3. Keep track of deadlinesWrite down the dates. If a deadline is missed, ask why in writing.
  4. Complain if it goes wrongComplain to the grid operator first, then to the body named below.

📇 Who to contact

Cerius — Nordvest-, Midt- og Sydsjælland, Lolland-Falster og øerneRuns the local grid, meters and connectionsPower cut, meter problem, new connection📞 70 29 20 24🔗 cerius.dk/stroemafbrydelse
Vores Elnet — Størstedelen af FynRuns the local grid, meters and connectionsPower cut, meter problem, new connection📞 63 10 81 00🔗 voreselnet.dk/kontakt-os
Radius Elnet — Københavnsområdet, Nordsjælland og dele af MidtsjællandRuns the local grid, meters and connectionsPower cut, meter problem, new connection📞 70 20 48 00🔗 radiuselnet.dk/stroemafbrydelse
N1Runs the local grid, meters and connectionsPower cut, meter problem, new connection📞 70 23 00 43🔗 n1.dk/driftsstatus
ForsyningstilsynetSupervises energy companies and explains your rightsFor information, and to report a company that breaks the rules📞 4171 5400🔗 forsyningstilsynet.dk
Ankenævnet på EnergiområdetSettles disputes with energy companiesWhen the company has not solved your complaint📞 4171 5301🔗 energianke.dk

❓ Questions

Who pays for the connection?

Usually the customer pays a connection charge set by the grid operator or the regulator.

Why does my grid operator refuse or delay?

Sometimes the local grid is full. Ask for the reason and the expected date in writing.

Do I need a new connection for solar panels?

Often not for small systems, but you usually have to register them with the grid operator.

📎 Sources

Checked: 2026-09-30

🧭 Is this still correct?

We check this information carefully, but phone numbers, websites and rules change — and sometimes we get something wrong. Spotted a mistake or a change? Let us know below.