Electricity & gas in Bulgaria: your rights
The rules that protect you as an electricity and gas customer in Bulgaria, and who to contact. Every fact is checked on an official source.
FFCheck One: every FFCheck Letter included, €4.99 a month
A formal letter for your problem whenever you need one: PDF and email text, with the final reminder and your next step. Cancel any time.
Facts from this page's own sources · a small team in Amsterdam · no ad networks · delete everything any time
What is going on?
Everything at a glance
The market
Households connected at low voltage that have not chosen another supplier are supplied by their regional end supplier at a price set by KEVR (Energy Act art. 94a and 97, as amended in 2025); the law sets no date for full market opening for households. You may still switch to a licensed trader on the free market at any time. Gas customers may also choose their supplier.
Energy regulator
Комисия за енергийно и водно регулиране (КЕВР)
Dispute resolution
Омбудсман на Република България
Complain to your supplier or grid company first: by law your contract must set out the complaints procedure, and the company must decide within 3 months of receiving your complaint (Energy Act art. 38a). If you get no answer or are not satisfied, complain in writing to KEVR, which first tries to settle the dispute and otherwise decides within two months, or file an online complaint with the Ombudsman. If you doubt your meter, you can ask the grid company for a test by the Bulgarian Institute of Metrology: the grid company pays if the meter is faulty, you pay if it is accurate (art. 38zh).
Compare prices official
Платформа за смяна на доставчик на електрическа енергия на КЕВР
Switching supplier
Switching is free and unlimited. By law the grid company completes the switch within three weeks of your written request, for electricity and gas alike; it may not come with extra obligations, and your old supplier must send a final settlement bill within six weeks (Energy Act art. 95 and 180). In practice your new electricity supplier files the request electronically with the grid company by the 10th of the month, and the switch takes effect on the 1st of the next month. Your current supplier may only object over a still-running contract, a penalty written into it or a missing payment guarantee. Clear old bills: a previous supplier you still owe can have your power suspended after 5 working days' notice.
Price rises
Regulated household electricity prices are set by KEVR once a year, from 1 July. For 1 July 2026 – 30 June 2027 the average rise is 2.99%. On the free market the law sets no advance notice period: your supplier must tell you about every proposed change to the contract terms or prices, and you may then end the contract within 30 days of that notice, without penalty, if you do not accept them (Energy Act art. 38v). A price rise is notified no later than the first bill after it takes effect; where KEVR approves the general terms, publishing the approved terms counts as the notice.
Regulated price
Households supplied by their end supplier (Electrohold, EVN, Energo-Pro, ESP Zlatni Pyasatsi) pay a price made of a KEVR base value plus a supplier component. The state Electricity System Security Fund covers the gap to market prices.
Help if money is tight
There is no social electricity tariff, but low-income households can get a heating allowance: €64.39 a month from 1 November 2026 to 31 March 2027. Apply to your local Social Assistance Directorate by 31 October 2026.
Protection against cut-off
If you do not pay your bills, your supplier may have your electricity suspended (Energy Act art. 123). The law adds safeguards: supply may not be cut on a rest day or public holiday or on the day before one; an end supplier must warn you at least 3 days before the cut-off date, by the contact method you chose (art. 38z); the notice periods and other conditions are in your contract or the general terms; and before a planned cut-off the supplier must inform you of alternatives such as a payment plan, prepayment, debt advice or a deferral. Supply is restored once you have paid the overdue amounts plus the disconnection and reconnection charges at the approved price list. Since April 2026 suppliers are told which customers hold vulnerable-customer status and must apply their special procedures so that these customers are not cut off (see the vulnerable-customers page). If you cannot pay, contact your supplier early.
If your supplier goes bust
You will not be left without power. If your free-market supplier stops supplying you, a supplier of last resort takes over temporarily until you choose a new supplier. Its price is considerably higher, so switch quickly.
Power cut
Report power cuts to your regional grid company (24/7 lines below). Under the grid companies' general terms, if you are without power for more than 24 hours through the grid company's fault, it owes you €15.34 (30 leva), plus €10.23 (20 leva) for each further 12 hours. At Elektrorazpredelenie Sever the 24 hours count from your report, so report the fault straight away. Nothing is owed for force majeure or for planned work announced in advance (up to 24 hours).
Cooling-off period
For contracts made away from the trader's premises or at a distance (online, phone) you can withdraw within 14 days. Tell the trader in writing.
Smart meter
There is no nationwide smart-meter rollout yet. Where smart meters are not being rolled out systematically, the Energy Act gives you the right to have one installed at your own cost: the grid company must tell you beforehand what the meter can do, which services and benefits it brings and what you will pay, as well as the installation date, which may be no later than 4 months after your request (art. 120(11)–(12)). Grid companies must review and publish the installation costs on their websites at least every two years. The meter stays the grid company's property, and it must be easy for you to read, directly and online.
Solar panels
Rooftop solar for your own use: you only notify your grid company (up to twice your contracted power), and it sends you an addendum to your access contract within 14 days. Power you use yourself carries no network charges; surplus may be stored or sold at market prices through a supplier or a purchase agreement, once the producer connection procedure is done. A rooftop plant up to 30 kW built to sell its power is bought by your end supplier at the preferential price KEVR sets every year (€54.57/MWh excl. VAT from 1 July 2026); own-use installations do not get that price.
Fixed and dynamic contracts
Under the Energy Act (amended in 2023), end suppliers and electricity traders must offer households fixed-term, fixed-price contracts, and dynamic-price contracts to customers with a smart meter. You can only be moved to a dynamic-price contract with your explicit consent.
- Before you sign or renew a contract, the company must give you a short, clear summary of the key terms: total price, promotions, extra services, discounts and your rights. (dv.parliament.bg)
- KEVR must publish a yearly report on dynamic-price contracts: what is offered on the market, the effect on consumers' bills and price volatility. (dv.parliament.bg)
Energy sharing and communities
Under the Renewable Energy Act (ЗЕВИ), self-consumers in the same building, including a block of flats, may act jointly and share among themselves electricity from the building's renewable installation. Households may also join a renewable energy community, which can share energy from its own installations among members.
- As a self-consumer you may store your power and sell surplus through suppliers or peer-to-peer trading agreements. The grid company may not charge network fees for power you produce and use on your own premises. (me.government.bg)
Heating without the gas grid
KEVR sets the prices at which district-heating companies (топлофикации) sell heat to customers. It also handles complaints from customers against energy suppliers, including heat suppliers, first trying to settle the dispute and otherwise deciding within two months (can be extended).
- You choose how to pay for heat: 11 equal monthly instalments plus an equalisation payment, monthly payments based on forecast consumption plus equalisation, or actual monthly use. You must be billed on actual use at least once a year. (me.government.bg)
- If owners of at least two-thirds of a building on one substation no longer want district heating, they declare it in writing; the heating company must stop supply within 15 days. (me.government.bg)
Back-billing and estimated bills
If your meter was faulty or the wiring was changed, the grid company may recalculate your consumption only for the shorter of the time since the last check or the 3 months before the problem was found. For an illegal connection the limit is 180 days.
- Every recalculation needs an inspection report (констативен протокол) signed by you, or, if you are absent or refuse, by a witness who does not work for the company. It must then be sent to you within 7 days. (dker.bg)
- If a check shows you were charged for more electricity than you used, the whole overpaid amount is refunded in the month after the check. (dker.bg)
Energy costs for tenants
In a block of flats on district heating, heat is split between flats by heat-cost allocation (дялово разпределение). All owners connected to the substation are heat customers and must fit allocators on their radiators. The allocation company must be listed in the Ministry of Energy's public register.
- With heat-cost allocation in place you may not physically disconnect your radiators from the building installation during the heating season. If you stop heating your flat, you still pay for heat given off by the building installation and the common areas. (me.government.bg)
Vulnerable and medical customers
Since 17 April 2026 a government ordinance (Decree No 46/2026, State Gazette No 36) defines who is a vulnerable electricity customer: a household customer who, or whose household member, critically depends on electrical equipment because they are over 65 and live alone or only with other over-65s on an income at or below the poverty line after energy costs, have a disability of 50 % or more with the same income test, need an electrically powered aid or medical device to live independently or stay alive, or received monthly social assistance or the heating allowance in the previous heating season. Suppliers and grid companies receive the status through a national information system and must apply their special procedures so that these customers are not cut off; end suppliers must show the status on the bill.
- You do not always have to apply: the status is granted automatically for one year from data held by the Social Assistance Agency (ASP) and the National Health Insurance Fund (NZOK). Otherwise any adult household member files a declaration form with the Social Assistance Directorate for their current address, through the e-government portal, at an administrative service centre or by post. (dv.parliament.bg)
- The certificate is issued by the director of the Social Assistance Directorate and is valid for 12 months from the 1st of the month after it was issued. If something is missing you get 30 days to fix it; a refusal can be appealed to the regional social assistance directorate. (dv.parliament.bg)
- The same ordinance defines energy poverty: a household is energy-poor when its disposable income, after deducting the typical annual energy cost of its home (based on floor area, building type and a vulnerability factor), divided by 12 and by the number of members, is at or below the national poverty line for the year. That status is the basis for support measures run by the energy, social and regional development ministries. (dv.parliament.bg)
Grid connection
For a rooftop or facade renewable system up to 30 kW, the grid company must issue its connection opinion within 20 days. Permits for solar systems up to 20 kW on buildings must be completed within one month.
- A rooftop system only for your own use (up to twice your contracted power) needs only a notification to the grid company, which must send you a supplementary agreement within 14 days. You may feed power into the grid only after connecting as a producer. (me.government.bg)
- For solar up to 20 kW, if the building authority does not decide in time, this counts as consent, as long as the system is not larger than your contracted power. (me.government.bg)